Jaw Crusher | Impact Crusher | Spring Cone Crusher |
  • Home
  • About Us
  • Products
  • News
  • Case
  • FAQ
  • Contact Us
Skype : hi-unique
sales@unique-crusher.com
+86-371-63699132
Your position: Home > Faq
Main Products
Stone Crusher
  • Jaw Crusher Impact Crusher Spring Cone Crusher Symons Cone Crusher Hydraulic Cone Crusher Hammer Crusher Raymond Mill Vibrating Screen Sand Maker Vibrating Feeder Wheel Sand Washing Machine Screw Sand Washing Machine Crawler Rock Drill Belt Conveyor
Stone Crushing Plant
  • 40-60 TPH Stone Crushing Plant 100-120 TPH Stone Crushing Plant 150-180 TPH Stone Crushing Plant 200-250 TPH Stone Crushing Plant 300-350 TPH Stone Crushing Plant Artificial Sand Making Plant
Mobile Crusher
  • Mobile Jaw Crusher Mobile Impact Crusher Mobile Cone Crusher Construction Waste Crusher
Ore Processing Equipment
  • Raymond Mill Flotation Machine Ball Mill High-efficiency Concentrator Ceramic Ball Mill Magnetic Separator Agitation Tank LS Series Shaking Table Spiral Classifier Spiral Chute Rod Mill Conical Ball Mill Ball Mill Magnetic Separator
Cement Production Line
  • Cement Production Line Rotary Kiln Cement Mill Rotary Dryer Air-swept Coal Mill Raw Mill Single Drum Cooling Machine
Need Help?

or Email us:

sales@unique-crusher.com
Share With
Facebook Twitter Email Print More
Hot Product
  • jaw-crusher

    Jaw Crusher

  • stone-impact-crusher

    Impact Crusher

  • spring-cone-crusher

    Spring Cone Crusher

  • Cone Crusher for Sale

    Symons Cone Crusher

  • hydraulic-cone-crusher

    Hydraulic Cone Crusher

How to run a complete crushing plant?

 

After setting up the stone crushing plant, the most important thing is the daily operation of it. Zhengzhou Unique Industrial Equipment Company would like to show you how to run the whole stone crushing plant in a right way as follows:

1. Inspect all the parts of the rock crusher before operation and make any repairs or add lubrication where needed. Check for broken teeth, bolts and belts and make sure there are no obstructions in the stone crushing cavity.
2. Turn on the engine of the rock crusher and listen to make sure that it is operating properly.
3. Start the crushing mechanism of the stone crusher to make sure all components are operating smoothly. Shut down the machine and make repairs where necessary.
4. Set the crusher up under a conveyor belt that can carry crushed rock to a pile or dump truck.
5. Adjust the opening of the stone crusher to accommodate the size of the stones you will be crushing. If you leave the opening too wide, your machine will be performing excessive work, leading to unnecessary wear on your stone crusher.
6. Feed large stones into the cavity of your stone crusher with a crane or conveyor belt and allow the machine to do the work.
7. Feed crushed stones into a secondary stone crusher to achieve smaller rocks, if desired. If you use a jaw crusher, you may need to use a roller crusher to produce gravel-sized rocks.
8. Turn off the power to the machine and inspect its parts to make sure there are no stones lodged in the stone cavity.
 


Pre: How to Maintain Ball Mill
Next: How to select the sand maker and sand washer for your artificial sand production line?